Good design starts with the site

23 March 2022 _ ARCHITECTURE _ BY Elena Rostova _ 2 comments

Before the first line is drawn comes the analysis: orientation, topography, neighbouring buildings, zoning plan and microclimate. Only once these conditions are clear does a design emerge that uses daylight, reduces energy demand and sits naturally in its surroundings. Skip this step and you pay for it later — in variations, in running costs, or in rooms that never quite feel right.

Detail of a timber-concrete structure
Facade section with panoramic glazing

From model to building site

In the BIM model, architecture, structure and building services come together. Clashes appear on screen rather than on site, quantities can be determined reliably and costs forecast precisely. That leaves time on site for what really matters: execution quality.

A building is good when it still feels self-evident twenty years on — not when it shouts loudest in its first year.

Elena Rostova, Lead Architect

Comments (2)

Saiful Islam

Very well explained — especially the point that site analysis determines the quality of the later design.

3 February 2023 Reply

Jhon Smith

The description of the BIM process matches our experience: finding clashes early saves the most time in the end.

3 February 2023 Reply

Let's Get in Touch

Your email address will not be published. Required fields are marked *